Disclaimer: This site has been first put up 15 years ago. Since then I would probably do a couple things differently, but because I've noticed this site had been linked from news outlets, PhD theses and peer rewieved papers and because I really hate the concept of "digital dark age" I've decided to put it back up. There's no chance it can produce any harm now.
| Identifier: | 94KHARTOUM4688 |
|---|---|
| Wikileaks: | View 94KHARTOUM4688 at Wikileaks.org |
| Origin: | Embassy Khartoum |
| Created: | 1994-09-13 09:28:00 |
| Classification: | SECRET |
| Tags: | PTER SU IR |
| Redacted: | This cable was not redacted by Wikileaks. |
R 130928Z SEP 94 FM AMEMBASSY KHARTOUM TO SECSTATE WASHDC 8923
S E C R E T SECTION 01 OF 02 KHARTOUM 04688 E.O. 12356: DECL:OADR TAGS: PTER, SU, IR SUBJECT: UNUSUAL IRANIAN PRESENCE IN NORTHERN SUDAN? 1. SECRET ENTIRE TEXT. 2. SUMMARY. ACCORDING TO A NORMALLY RELIABLE CONTACT WHO RECENTLY VISITED RELATIVES IN THE AREA, THE IRANIAN AGRICULTURAL PROJECT LOCATED NEAR EL GEITI NORTH OF KHARTOUM IS BASICALLY INACTIVE. THE IRANIANS REPORTEDLY MAINTAIN, HOWEVER, A SECOND, LARGE FACILITY A FEW KILOMETERS FROM THIS AGRICULTURAL PROJECT. THE AREA IS OFF LIMITS TO LOCAL TOWNSPEOPLE, AND MOST MOVEMENT TO AND FROM THE FACILITY OCCURS AT NIGHT. THE LOCAL POPULATION DOES NOT KNOW WHAT PURPOSE THIS SECOND IRANIAN FACILITY SERVES. END SUMMARY. 3. THE IRANIAN GOVERNMENT RUNS AN AGRICULTURAL PROJECT LOCATED APPROXIMATELY 55 KILOMETERS NORTH OF KHARTOUM, AND SOME FIVE KILOMETERS NORTH OF THE TOWN OF EL GEITI, ON THE PAVED ROAD LEADING FROM KHARTOUM TO SHENDI. THE PROJECT COMPOUND ABUTS THE LEFT (WEST) SIDE OF THE ROAD WHEN ONE IS TRAVELING FROM EL GEITI TO SHENDI. THE FENCED COMPOUND CONSISTS OF A FEW SINGLE-STORY OFFICE AND/OR STORAGE BUILDINGS AND ONE OR TWO LARGE STORAGE HANGARS, UNDER WHICH ARE PARKED HALF A DOZEN LARGE PIECES OF AGRICULTURAL MACHINERY, WHICH FROM A DISTANCE APPEAR TO BE HARVESTERS. THE OSTENSIBLE PURPOSE OF THE PROJECT IS TO ASSIST AREA FARMERS. 4. NEAR THE COMPOUND ARE TWO SMALL VILLAGES, WAD RAMLI AND WAD WISI (PHONETIC). ACCORDING TO A GOOD EMBASSY CONTACT WHO WAS BORN AND RAISED IN THE AREA AND WHO RECENTLY VISITED RELATIVES THERE, THE IRANIAN PROJECT IS BASICALLY INACTIVE AND PROVIDES NEXT TO NO ASSISTANCE TO LOCAL FARMERS. ON OCCASION IRANIAN PROJECT STAFF RENT THEIR VEHICLES TO LOCAL FARMERS TO TRANSPORT FARM PRODUCE, BUT AT THE GOING COMMERICAL RATE. 5. ACCORDING TO THE LOCAL TOWNSPEOPLE, THE LARGER MACHINERY RARELY, IF EVER, MOVES. THE WHOLE AREA IS BASICALLY SEMI-DESERT OR DESERT, WITH, HOWEVER, A THIN BAND OF FERTILE AND WELL-WATERED FIELDS ALONG THE BANKS OF THE NILE, WHICH FLOWS IN A SOUTH-NORTH DIRECTION PARALLEL TO THE ROAD, FIVE TO TEN KILOMETERS WEST OF THE PAVEMENT. 6. OUR SOURCE REPORTS THAT THERE IS A SECOND IRANIAN COMPOUND, FACING THE AGRICULTURAL PROJECT, BUT LOCATED APPROXIMATELY 3 KILOMETERS EAST OF IT, ON THE OTHER SIDE OF THE KHARTOUM/SHENDI ROAD AND THE NEARBY RAILROAD LINE. UNLIKE THE AGRICULTURAL PROJECT, THIS SECOND IRANIAN COMPOUND IS NOT AS EASILY VISIBLE FROM THE ROAD. 7. OUR SOURCE STATED THAT THIS SECOND COMPOUND, WHICH IS ALSO FENCED, IS VERY LARGE. (HE WAS NOT, HOWEVER, MORE SPECIFIC). IT INCLUDES A NUMBER OF TEMPORARY- TYPE STRUCTURES SIMILAR OR SLIGHTLY LARGER IN SIZE TO MOBILE HOMES. THE AREA IS OFF-LIMITS TO THE LOCAL TOWNPEOPLE. OUR SOURCE SAID HE HAD SPOKEN TO LOCAL HERDERS WHO COMPLAINED THEY COULD NO LONGER TAKE THEIR FLOCKS TO THE SITE, A TRADITIONAL GRAZING AREA. 8. ACCORDING TO OUR SOURCE, THE TOWNSPEOPLE DO NOT KNOW WHAT PURPOSE THE SECOND COMPOUND SERVES. MOST MOVEMENT TO AND FROM THE FACILITY IS AT NIGHT. THE IRANIAN STAFF WORKING (AND PRESUMABLY LIVING) THERE RARELY VISIT THE NEAR-BY VILLAGES AND HAVE NEXT TO NO CONTACT WITH THE LOCAL POPULATION. REPORTEDLY, ON A FEW OCCASIONS NOCTURNAL VEHICLE MOVEMENT TO AND FROM THE SITE HAS BEEN HEAVY. 9. COMMENT. AS PART OF ITS PROGRAM OF COOPERATION WITH SUDAN, THE IRANIAN GOVERNMENT IS ASSISTING SUDAN WITH ROAD-BUILDING AND HAS DESPATCHED IRANIAN CONSTRUCTION CREWS AND ROAD-BUILDING EQUIPMENT TO SUDAN. THE LATTER, HOWEVER, ARE ENGAGED IN THE CONSTRUCTION OF THE KOSTI-MALAKAL ROAD (PEACE ROAD), AN IRANIAN AID PROJECT SOUTH OF KHARTOUM. 10. THE KHARTOUM-SHENDI ROAD IS PART OF A SEPARATE ROAD CONSTRUCTION PROJECT WHICH WILL EVENTUALLY LINK KHARTOUM TO ATBARA. THE KHARTOUM-SHENDI PORTION HAS ALREADY BEEN PAVED, AND WORK IS BEGINNING ON THE SHENDI-ATBARA SECTION. CONSTRUCTION IS BEING CARRIED OUT BY THE "EL HIJRA" CONSTRUCTION COMPANY BELONGING TO SAUDI BUSINESSMAN (AND BACKER OF RADICAL CAUSES) OSAMA BIN LADEN. THE COMPANY HAS CONSTRUCTION AND MAINTENANCE CAMPS AT REGULAR INTERVALS ALONG THE ROAD. AN EMBASSY OFFICER, SPEAKING TO MEMBERS OF ONE OF THE COMPANY'S ROAD CREWS SEVERAL MONTHS AGO, NOTED THAT THEY WERE NON-SUDANESE--POSSIBLY PALESTINIAN. 11. IT IS CONCEIVABLE THAT THE PERSONNEL OUR SOURCE (A FORMER TOP-RANKING GOVERNMENT OFFICIAL UNDER AN EARLIER REGIME, WHO HAS SO FAR PROVEN TO BE RELIABLE) BELONG TO THE BIN LADEN CONSTRUCTION PROJECT. OUR SOURCE, HOWEVER, WAS CATEGORICAL THAT THE PERSONNEL HE HAS DESCRIBING WERE IRANIAN. HE FURTHER DESCRIBED BOTH THEIR BEHAVIOR AND THE SECURITY SURROUNDING THEIR SITE AS UNUSUAL. WE CANNOT ASCERTAIN PRECISELY WHO THEY ARE OR WHAT THEY ARE DOING, BUT PASS ON THE INFORMATION IN THE EVENT OTHERS MAY FIND IT OF INTEREST. PETTERSON
Latest source of this page is cablebrowser-2, released 2011-10-04