Disclaimer: This site has been first put up 15 years ago. Since then I would probably do a couple things differently, but because I've noticed this site had been linked from news outlets, PhD theses and peer rewieved papers and because I really hate the concept of "digital dark age" I've decided to put it back up. There's no chance it can produce any harm now.
| Identifier: | 04MADRID2179 |
|---|---|
| Wikileaks: | View 04MADRID2179 at Wikileaks.org |
| Origin: | Embassy Madrid |
| Created: | 2004-06-09 14:46:00 |
| Classification: | CONFIDENTIAL |
| Tags: | OTRA ENRG TRGY SP TECH |
| Redacted: | This cable was not redacted by Wikileaks. |
This record is a partial extract of the original cable. The full text of the original cable is not available.
C O N F I D E N T I A L SECTION 01 OF 02 MADRID 002179 SIPDIS STATE PLEASE PASS TO NRC E.O. 12958: DECL: 06/08/2014 TAGS: OTRA, ENRG, TRGY, SP, TECH SUBJECT: COMMISSIONER JEFFREY MERRIFIELD'S OFFICIAL VISIT TO SPAIN ON MARCH 28-APRIL 2, 2004 1. (C) SUMMARY: COMMISSIONER JEFFREY MERRIFIELD OF THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) VISITED SPAIN MARCH 28 TO APRIL 2, 2004 TO CONDUCT THE SECOND ANNUAL HIGH LEVEL BILATERAL MEETING WITH THE SPANISH NUCLEAR SECURITY COUNCIL (CSN) AND TO PARTICIPATE IN THE NUCLEAR ENERGY INDUSTRY'S WORLD NUCLEAR FUEL CYCLE CONFERENCE. HE ALSO VISITED THE TRILLO NUCLEAR POWER STATION, TECNATOM, ENSA (EQUIPOS NUCLEARES), AND THE SANTA MARIA DE GARONA NUCLEAR POWER PLANT. COMMISSIONER MERRIFIELD,S MEETINGS INCLUDED THOSE WITH U.S. AMBASSADOR GEORGE ARGYROS, CSN PRESIDENT MARIA TERESA ESTEVAN, CSN VICE-PRESIDENT AZUARA, CSN COMMISSIONERS SENDIN, BARCELO, AND MARTINEZ-TEN, AND SENIOR EXECUTIVES OF SPANISH NUCLEAR UTILITIES. THE CSN AND NRC EXCHANGED INFORMATION ON SUMP CONCERNS FOR PRESSURIZED WATER REACTORS, FUEL PERFORMANCE, REACTOR HEAD INSPECTION/REPLACEMENT, GRID RELIABILITY, RISK INFORMED ENGINEERING INSPECTIONS, MANAGEMENT OF HIGH AND LOW LEVEL WASTE, RECENT POWER PLANT OPERATING EXPERIENCE, PHYSICAL PROTECTION, IMPORT OF SCRAP METAL, DECOMMISSIONING, INTERNATIONAL ACTIVITIES, AND PUBLIC COMMUNICATION. MEETINGS WITH THE OTHER CSN COMMISSIONERS REVEALED SIGNIFICANT RESENTMENT AND IN-FIGHTING WITHIN THE CSN. END SUMMARY. 2. (U) COMMISSIONER JEFFREY MERRIFIELD,S VISIT WAS WELL-RECEIVED IN SPAIN. HE WAS ACCOMPANIED BY HIS TECHNICAL ASSISTANT JOHN THOMA, AND CINDY ROSALES BUSH, INTERNATIONAL RELATIONS OFFICER. FOR THE FIRST DAY OF THE TRIP, THE COMMISSIONER WAS ALSO ACCOMPANIED BY NRC SENIOR MANAGEMENT BILL BORCHARDT AND JOHN GREEVES, WHO SUPPORTED THE BILATERAL MEETINGS. HIS VISIT BEGAN WITH A COURTESY VISIT WITH AMBASSADOR ARGYROS IN MADRID, WHERE HE BRIEFED THE AMBASSADOR ON THE NUCLEAR ENERGY OUTLOOK IN THE U.S. AND NRC'S COOPERATIVE ACTIVITIES WITH THE CSN. ECON OFFICER ACCOMPANIED THE DELEGATION TO THE HIGH LEVEL BILATERAL MEETING WITH THE CSN. PRESIDENT MARIA TERESA ESTEVAN & CSN COMMISSIONERS 3. (C) CSN PRESIDENT ESTEVAN WELCOMED COMMISSIONER MERRIFIELD AT CSN HEADQUARTERS IN MADRID. COMMISSIONER MERRIFIELD INDICATED TO PRESIDENT ESTEVAN THE IMPORTANCE OF NRC-CSN COOPERATION AND THE NRC,S DESIRE TO SEE IT AUGMENTED. HE INVITED PRESIDENT ESTEVAN TO CONSIDER SIGNING AN AGREEMENT WITH THE NRC FOR THE EXCHANGE OF CLASSIFIED INFORMATION TO ENABLE BOTH AGENCIES TO COOPERATE ON MATTERS OF PHYSICAL SECURITY. PRESIDENT ESTEVAN INDICATED THAT THE CSN WAS CONSIDERING THE OPPORTUNITY. SHE THEN ESCORTED COMMISSIONER MERRIFIELD TO A MEETING WITH CSN VICE-PRESIDENT AZUARA AND COMMISSIONERS SENDIN, BARCELO, AND MARTINEZ-TEN. CSN-NRC HIGH LEVEL BILATERAL 4. (C) COMMISSIONER MERRIFIELD CO-CHAIRED THE HIGH LEVEL BILATERAL MEETING WITH PRESIDENT ESTEVAN. PRESENTATIONS WERE MADE BY CSN AND NRC SENIOR STAFF. TECHNICAL ISSUES DISCUSSED AT THE MEETING INCLUDED SUMP CONCERNS FOR PRESSURIZED WATER REACTORS, FUEL PERFORMANCE, REACTOR HEAD INSPECTION/REPLACEMENT, GRID RELIABILITY, RISK INFORMED ENGINEERING INSPECTIONS, MANAGEMENT OF HIGH AND LOW LEVEL WASTE, RECENT POWER PLANT OPERATING EXPERIENCE, PHYSICAL PROTECTION, IMPORT OF SCRAP METAL, DECOMMISSIONING, INTERNATIONAL ACTIVITIES, AND PUBLIC COMMUNICATION. NRC PRESENTATIONS WERE MADE BY RICHARD BORCHARDT, NRC DEPUTY DIRECTOR FOR NUCLEAR REACTOR REGULATION, AND JOHN GREEVES, DIRECTOR FOR HIGH LEVEL WASTE MANAGEMENT, NRC. COMMISSIONER BARCELO WAS THE ONLY CSN COMMISSIONER PRESENT AT THE BILATERAL. VICE PRESIDENT AZUARA AND COMMISSIONERS SENDIN AND MARTINEZ-TEN DID NOT ATTEND IN PROTEST OF PRESIDENT ESTEVAN,S DECISION TO JOIN THE COURTESY MEETING COMMISSIONER MERRIFIELD HAD WITH THE OTHER COMMISSIONERS. 5. (U) COMMISSIONER MERRIFIELD SUMMARIZED NRC,S RESPONSE TO THE BLACK-OUT OF AUGUST 14, 2003 AND SPOKE OF THE ROLE OF NRC,S EMERGENCY RESPONSE OPERATION CENTER DURING THE EVENT. PRESIDENT ESTEVAN INDICATED THAT SPAIN HAS TWO NUCLEAR POWER PLANTS (ASCO 1 & 2) THAT WILL NEED VESSEL HEAD REPLACEMENTS IN THE NEAR FUTURE AND THAT THE CSN LACKS EXPERIENCE IN REGULATING AND INSPECTING VESSEL HEADS AND REPLACEMENT PROCEDURES. COMMISSIONER MERRIFIELD PROMISED TO MAKE AVAILABLE TO CSN THE PILOT INSPECTION PROCEDURE MANUAL ON VESSEL HEAD REPLACEMENT. PRESIDENT ESTEVAN POINTED OUT THAT THE CSN WAS IMPLEMENTING NRC INSPECTION PROCEDURES AT THE CONFRENTES NUCLEAR POWER PLANT (NPP) AS A RESULT OF THE VISIT OF NRC RESIDENT INSPECTOR ROGERIO REYES TO SPAIN IN JANUARY 2004. 6. (U) PRESIDENT ESTEVAN EXPRESSED TO COMMISSIONER MERRIFIELD CONCERNS OVER THE AMOUNT OF RADIOACTIVE SOURCES IN IMPORTED SCRAP METAL. SPAIN IMPORTS 10-12 MILLION TONS OF SCRAP METAL YEARLY; THE MAJORITY FROM THE U.S. THE NUMBER OF RADIOACTIVE SOURCES FOUND IN THE SCRAP METAL HAS INCREASED IN THE PAST COUPLE OF YEARS. AS A RESULT, THE CSN DEVELOPED A NATIONAL SCRAP METAL PROTOCOL AS A VOLUNTARY COMMITMENT WITH STAKE HOLDERS. SIGNATORIES TO THE PROTOCOL INCLUDE THE SPANISH MINISTRIES OF ECONOMY AND PUBLIC WORKS, CSN, WASTE MANAGEMENT COMPANY ENRESA, THE SPANISH FEDERATION OF RECOVERY INDUSTRIES, AND THE STEEL AND IRON ASSOCIATIONS. COMMISSIONER MERRIFIELD,S VISIT TO CSN HEADQUARTERS ENDED WITH A TOUR AND PRESENTATION OF THE CSN EMERGENCY RESPONSE CENTER. ALTHOUGH THE CENTER IS CONSIDERED FUNCTIONAL, THE CSN IS CURRENTLY IN THE PROCESS OF UPDATING ITS TECHNOLOGY. TRILLO NUCLEAR POWER STATION 7. (U) COMMISSIONER MERRIFIELD MET WITH AQUILINO RODRIGUEZ CASES, DIRECTOR OF THE TRILLO NPP IN GUADALAJARA, SPAIN ON MARCH 30 AND TOURED THE PLANT. CSN COMMISSIONER JULIO BARCELO ACCOMPANIED HIM ON THE VISIT. THE TRILLO NPP IS A 1066 MWE, GERMAN (SIEMENS) DESIGN PRESSURIZED WATER REACTOR AND HAS BEEN IN OPERATION SINCE 1988. COMMISSIONER MERRIFIELD TOURED THE SECONDARY SYSTEM AND DIESEL GENERATOR ROOMS, CABLE SPREADING ROOM, MAIN AND REMOTE CONTROL ROOMS, AND CONTAINMENT AREA AND NOTED DIFFERENCES IN DESIGN OF THE SIEMENS PWR FROM THOSE IN THE U.S. (E.G., THE SIEMENS DESIGN DID NOT INCLUDE A CONTAINMENT SPRAY SYSTEM). NEI/WNA WORLD NUCLEAR FUEL CYCLE CONFERENCE 8. (U) ON MARCH 31, COMMISSIONER MERRIFIELD PARTICIPATED AS KEYNOTE SPEAKER IN THE NEI/WNA WORLD NUCLEAR FUEL CYCLE CONFERENCE. COMMISSIONER MERRIFIELD,S SPEECH, ENTITLED "DO REGULATORS ADD VALUE?" SUMMARIZED CURRENT NRC ACTIVITIES IN REGULATING POWER REACTORS AND SELECTED ELEMENTS OF THE NUCLEAR FUEL CYCLE OF RELEVANCE TO CONFERENCE ATTENDEES. TECNATOM AND ENUSA 9. (U) COMMISSIONER MERRIFIELD, ACCOMPANIED BY CSN COMMISSIONER BARCELO, MET WITH ANTONIO ALONSO, DIRECTOR GENERAL OF TECNATOM, DURING HIS TOUR OF THE FACILITY ON MARCH 31 IN MADRID. TECNATOM PROVIDES NUCLEAR SERVICES WORLD WIDE, SUCH AS TRAINING OF BOTH NUCLEAR AND NON-NUCLEAR WORKERS, AND DEVELOPS TECHNOLOGY FOR COMPONENT INSPECTION AND FACILITIES. COMMISSIONER MERRIFIELD ALSO MET WITH JOSE GUTIEREZ ELSO OF ENUSA ,WHO DESCRIBED ENUSA,S CORPORATE AND INDUSTRIAL ACTIVITIES IN SPAIN. ENSA 10. (U) COMMISSIONER MERRIFIELD MET APRIL 1 WITH EMILIO CABRERA, CHAIRMAN AND CEO OF EQUIPOS NUCLEARES, S.A (ENSA), AND TOURED THE COMPANY'S SITE IN SANTANDER. CSN COMMISSIONER PALOMA SENDIN ACCOMPANIED THE COMMISSIONER. ENSA MANUFACTURES LARGE COMPONENTS FOR THE NUCLEAR INDUSTRY SUCH AS STEAM GENERATORS, REACTOR VESSEL HEADS, SPENT FUEL CASKS, AND DRY SHIELD CANISTERS. IN THE PAST 18 YEARS, ENSA HAS MANUFACTURED OVER 13 LARGE COMPONENTS FOR AMERICAN UTILITIES AND IS CURRENTLY WORKING ON CONTRACTS FOR FENOC, TXU, WESTINGHOUSE AND HOLTEC INTERNATIONAL. BOTH TXU AND WESTINGHOUSE MAINTAIN QUALITY ASSURANCE INSPECTORS ONSITE AT THE ENSA FACILITY. NUCLENOR: SANTA MARIA DE GARONA NPP 11. (U) ON APRIL 1-2, COMMISSIONER MERRIFIELD MET WITH JAVIER PINEDO, PRESIDENT OF NUCLENOR AT THE SANTA MARIA DE GARONA NPP. CSN COMMISSIONER PALOMA SENDIN ACCOMPANIED COMMISSIONER MERRIFIELD. COMMISSIONER MERRIFIELD ASKED ABOUT THE OPERATING EXPERIENCE OF GARONA GIVEN ITS APPLICATION TO THE CSN FOR LICENSE EXTENSION. GARONA IS 466MWE, GE BWR THAT HAS BEEN IN OPERATION SINCE 1970. THE COMMISSIONER NOTED THAT GARONA WAS IN VERY GOOD CONDITION AND CONGRATULATED MR. PINEDO ON THE SUCCESS OF THE PLANT. HIS VISIT INCLUDED A TOUR OF THE ONSITE MAINTENANCE TRAINING FACILITY, THE DIESEL GENERATORS, CONTAINMENT AREA, CABLE SPREADING ROOM, AND CONTROL ROOM. INTERNAL CSN DISSENT 12. (C) DURING THEIR SITE VISITS WITH COMMISSIONER MERRIFIELD, BOTH COMMISSIONER BARCELO AND COMMISSIONER SENDIN RELATED, AT LENGTH, THEIR VIEWS ON THE SIGNIFICANT DISSENSION WITHIN THE CSN. CSN COMMISSIONERS ARE ACCUSING PRESIDENT ESTEVAN OF HAVING A DICTATORIAL APPROACH TO LEADERSHIP. A MAJORITY OF COMMISSIONERS DID NOT ATTEND THE HIGH LEVEL BILATERAL IN AN ACT OF PROTEST AGAINST PRESIDENT ESTEVAN. 13. (U) THIS CABLE HAS BEEN APPROVED BY COMMISSIONER MERRIFIELD. NRC CONTACT: CINDY ROSALES-BUSH, (301) 415-1168, CER2@NRC.GOV. ARGYROS
Latest source of this page is cablebrowser-2, released 2011-10-04